Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Phase 1 of Pikeville's WC Hambley Football Facility Renovation is Complete
#25
PHSForever Wrote:Yes. Getting an actual inside practice facility. That is the building that was put on the pad of the old pool. The weight room is going to be over the top of what was the old pool office and current training room of the locker room. If you remember upstairs, there was a brick wall on the wrap around deck, that was blown out and the weight room is built off that part of the concourse. It will overlook the inside facility, which will be turfed.

Ok thanks i thought they were just getting a new weight room and football offices in that spot and did not realize they were also getting a inside practice facility. That is going to be insane when all completed lol.
Messages In This Thread
Phase 1 of Pikeville's WC Hambley Football Facility Renovation is Complete - by PHSFAN - 08-18-2018, 09:09 PM

Forum Jump:

Users browsing this thread: